Turning Stone Group

Calgary, Alberta

AHI campus master plan, concept render
Home›Investments›AHI

AI Hub of Innovation.

A powered campus for high-density AI infrastructure in Red Deer County, Alberta, with on-site generation, a transmission-grade grid connection and modular data halls on one titled site. Developed by Havenz Smart Communities, with Turning Stone as an investor holding board seats.

LocationRed Deer County, AB
StatusPhase 1A under construction
Our roleInvestor · board seats
Overview Flagship investment
Our thesis, in built form.
Real assets, Indigenous participation, sovereign infrastructure.

AHI is Turning Stone's flagship investment and our first platform. It pairs dispatchable on-site power with modular, high-density AI data infrastructure on an expandable Alberta campus, developed in partnership with First Nations, industry and government.

Land, power and permits are the scarce inputs of the AI economy. AHI has them in hand: generation under construction, development permits issued, gas supply contracted and a 138 kV grid connection advancing.

AHI · film
Power & AI · Red Deer County, AB

Power first. Then compute.

Power is secured before anything else, so the campus earns from generation and grid export as data halls come online.

Phase 1AUnder construction
Grid138 kV connection
Master plan300 MW platform
Our roleInvestor · board seats
The campus Three assets, one site
Data hall, concept render
30MW

AHI Data Halls

High-density AI infrastructure, delivered in 10 MW halls. Data Hall One permitted and advancing.

Prairie Eagle Cogen engine hall
30MW

Prairie Eagle Cogen

On-site combined heat and power in a permanent, hydrogen-capable building. Phase 1A under construction.

Transmission lines
150MW

Substation & Grid

138 kV connection with up to 150 MW of grid export, power that earns whether or not a hall is leased.

Phased growth

10 MW to 300 MW.

10 MWPhase 1A
30 MWFirst stabilized phase
300 MWMaster-planned platform

Each step is permitted, powered and financed on its own merits, so the campus grows without betting the whole on any single phase.

Master-planned campus (MW)
10
30
100
150
300
Phase 1A2027–28202820292030
Land±119.6 acresTitled campus, each asset on its own unit
PermitsPower & data hallDevelopment permits issued
GasSupply contractedFor 30 MW of on-site generation
Grid138 kVInterconnection advancing
RecognitionFederal prospectusCanada Investment Summit, 2026
Campus master plan · concept render
Engine hall · on site
Campus entrance · concept render
Engine delivery · on site
Prairie Eagle Cogen · engines
Energy building · concept render

Renders are concept visuals of the planned campus; photography is from the active construction site. Phase timing is indicative.

Partnership Who does what

One campus, one standard.

Turning Stone does not build or run AHI. We invest in it and hold board seats alongside the developer who does.

Turning Stone

Investor with board representation. We brought capital and structure to the project and hold seats at the board table.

Havenz Smart Communities

Developer. Leads land assembly, permitting, engineering, construction and operations.

First Nations

Partners and investors, with participation built into the capital structure from the start.

Get in touch

Interested in AHI?

Talk to the team about AHI, co-investment, or investing through the First Nations Opportunities Fund.